
Construction
Construction Dumpster Rental in Lakewood, CO
Framing scrap, drywall, tear-out and mixed C&D on a schedule that keeps your crew moving. Next-day swaps, straight tonnage, and a dispatcher who understands what a stalled container costs you.
A full container with no swap scheduled is a crew standing around. Everything we do on the construction side is built around not letting that happen — next-day swap-outs as standard, a real phone number that a person answers, and a dispatcher who can tell you at 7 a.m. whether the truck is coming before or after lunch. Cole started this company in 2012 after enough years on job sites to know exactly which part of this service actually matters.
We run containers for GCs, framers, remodelers, custom builders and demo crews from Golden and Morrison through Lakewood and Wheat Ridge into west Denver, and south toward Ken Caryl and Littleton. Additions, whole-house remodels, pop-tops, ADUs, basement finishes, commercial build-outs and full tear-downs. Sizes from 10 to 40, so we can put a small heavy box on a concrete phase and a 40 on the framing phase of the same job.
Pricing is flat rate with the tonnage stated up front. You know what a swap costs before you order it, which is the only way to bid a job honestly. Mixed C&D, clean loads, phased staging — tell us the sequence and we will build a schedule against it. If you want the disposal-side detail, our Denver metro debris guide covers what routes where.
Phases We Stage Containers Around
Interior Tear-Out
Drywall, plaster, lath, cabinetry, flooring and framing removed before the rebuild. Plaster and lath from pre-war stock weighs roughly double what crews estimate.
Framing & Sheathing Scrap
Cut-offs, banding, sheathing waste, engineered lumber ends and packaging. High volume, low weight — this is the phase that justifies a 40 yard.
Drywall & Finish Debris
Board scrap, mud buckets that must be dry, corner bead and trim waste. Steady daily volume that fills a container faster than the framing stage did.
Basement Finishes
The most common Lakewood construction job there is. Existing paneling and slab prep out, then framing, board and finish waste over several weeks.
Additions & Pop-Tops
Roof section removal, wall openings, old siding and structural demo alongside new-build scrap. Usually two containers staged rather than one held long.
Full Demolition
Structure teardown, garage and outbuilding removal. Requires an asbestos inspection report before most metro building departments will issue the demo permit.
Concrete & Flatwork
Driveway, patio and foundation breakout. Bentonite clay heave keeps this trade busy metro-wide. Clean concrete goes in a small box on a dedicated load.
Site & Rough Grading Debris
Stumps, buried debris, old irrigation and construction trash pulled during excavation. Call 811 before you dig, every time, no exceptions.
Matching Container Size to Trade Phase
Do not order one container for the whole job. Weight and volume behave completely differently by phase. Concrete, brick, tile, dirt and plaster want a 10 or 20 yard on a dedicated load — you will hit the weight limit at half height and a big box just tempts an overload the driver cannot legally haul. Framing scrap, insulation, siding, cabinetry and mixed C&D want a 30 or 40 yard, where the win is fewer swaps and fewer interruptions. A typical Lakewood whole-house remodel runs a 20 through demo, then 30s or 40s from framing to punch. We will map it with you before the first drop.
20 Yard Dumpster
Kitchen guts, basement finishes, multi-room renovations, large cleanouts.
View this size →30yd³30 Yard Dumpster
Whole-home cleanouts, new construction, additions, commercial projects.
View this size →40yd³40 Yard Dumpster
Maximum volume for bulky light debris: framing, siding, cabinetry, fit-outs.
View this size →Permits, Asbestos and Site Logistics
Two things stall Front Range jobs more than anything else. First, asbestos: CDPHE Regulation No. 8 requires inspection by a Colorado-certified inspector before renovation or demolition disturbing more than trigger amounts, and most metro building departments will not release a demo permit without the report in hand. Popcorn texture, 9x9 tile and mastic in pre-1980 stock test positive routinely. We cannot accept asbestos in any container. Second, placement: street or right-of-way staging needs a permit, and Lakewood, Jeffco, Golden and Denver each run their own process. Get both started at bid time. On site we need sixty feet of approach, overhead clearance, and a spot the swap truck can reach without a crane move.
Not sure this is the right service? Describe the job on the phone and we will point you at the right container even if it is a different service page. Call (720) 473-6600.
Get a flat quote
Two minutes on the phone gets you a size, a price and a delivery slot. No forms.
(720) 473-6600Recommended sizes
Related services
How it works
Construction Dumpster Rental in four steps
- 1
Call us
Tell us the project, your address and when you want it. Two minutes on the phone and you have a flat price.
- 2
We deliver
Our driver walks the drop, lays protection boards and sets the container exactly where you want it.
- 3
You load it
Take your time within your rental window. Keep it level with the top rail and we handle the rest.
- 4
We haul it
Call or text when you are done. We pull it, sort what can be recovered and dispose of the rest properly.
Construction Dumpster Rental FAQs
How fast can you swap a full container?
Next day is standard, and we hit it. If you call before our morning dispatch we can often get the swap out same day depending on truck load and where the site sits in the route. During peak hail season, when the entire metro is calling at once, next day is the honest promise and we would rather commit to it and beat it than miss it. Standing schedules on long jobs get priority.
What happens if we overload the container?
We cannot haul it. There is a legal axle weight limit and a fill line on the container for a reason — material above the rails is a road hazard and the landfill will turn a hot load away. If the driver arrives to an overloaded box, we will ask your crew to pull material off, which costs everyone a morning. Better to call for an earlier swap or size correctly at the start.
Can we mix concrete with the rest of the demo debris?
Not if you want it priced sensibly. Concrete, masonry, tile, dirt and rock are heavy debris and go on a dedicated load in a small container, where the disposal path and the weight math are different. Mixing a few chunks into a mixed load is manageable; loading a slab into a 30 yard of framing scrap creates a container nobody can legally lift. Order a separate box — see heavy debris.
Do you handle multi-container jobs on one site?
Yes, and phased staging is the normal way we run larger remodels and commercial build-outs. Separate containers for heavy debris, clean wood and mixed C&D on the same lot, rotated on a schedule that follows your trades. It also helps on Denver-side work where diversion requirements under Waste No More make material separation part of the closeout paperwork.
Who is responsible for the street permit?
Whoever pulls it, but we will tell you what you need and when to start. If the container goes on private property — driveway, parking lot, job site — no permit is required. Street or public right-of-way placement requires one, and processing time varies by jurisdiction across the metro. Start it at least a week out. Our permit rundown covers the local specifics.
More services
Other things we haul
Residential Dumpster Rental
Driveway, alley or street placement for cleanouts, remodels and basement projects.
Learn more →Commercial Dumpster Rental
Scheduled and on-call containers for retail, restaurants, offices and property managers.
Learn more →Roofing Dumpster Rental
Weight-rated cans for hail tear-offs, Class 4 shingle and concrete tile roofs.
Learn more →Roll-Off Dumpster Rental
10, 15, 20, 30 and 40 yard roll-offs delivered across Lakewood and Jefferson County.
Learn more →Same-Day Dumpster Rental
Call before the cut-off and we can usually get a container to you this afternoon.
Learn more →Junk Removal Dumpsters
Clear a basement, garage, shed or storage unit on your own schedule.
Learn more →Estate Cleanout Dumpsters
Discreet, patient container service for families clearing a lifelong home.
Learn more →Demolition Debris Removal
Containers and fast swaps for strip-outs, decks, sheds, patios and garages.
Learn more →Concrete & Heavy Debris
Dedicated heavy cans for concrete, flagstone, brick, landscape rock and dirt.
Learn more →Yard Waste & Landscaping Debris
Sod, xeriscape rock, brush, slash and storm debris hauled to be recovered.
Learn more →Where we deliver
Construction Dumpster Rental across Jefferson County and the west Denver metro
Same service, same flat rates, every town below. Pick yours for local placement and permit notes.
Talk to a real person
Need construction dumpster rental in Lakewood?
Tell us what you are clearing out and we will tell you the right size and the flat price to put it in your driveway. No forms, no waiting on an email — just call and we will sort it out in a couple of minutes.
Serving Lakewood, Jefferson County and the west Denver metro · Mon–Fri 6:30am–6pm, Sat 7am–3pm